Sichuan Yibin Zhongba Jinsha River bridge construction bidding announcement

Sichuan Yibin Zhongba Jinsha River bridge construction bidding announcement

China Construction machinery information

Guide: 1. Sichuan Yibin expansion economic and Technological Development Corporation (hereinafter referred to as the tenderee) has raised a fund, and it is planned to use part of the fund for the qualified payment under the construction of the south approach bridge and the North approach bridge of Zhongba bridge. 2. The current circulating test site of the project is located in the west of Yibin City, Sichuan Province

1. Sichuan Yibin expansion economic and Technological Development Corporation (hereinafter referred to as "the tenderee") has raised a fund, and it is proposed to use part of the fund for the qualified payment under the contract projects such as the construction of the south approach bridge and the North approach bridge of Zhongba bridge

2. The construction site of the project is located in Zhongba, the western suburb of Yibin City, Sichuan Province. The main bridge type of the project is a 252m+175m prestressed concrete single tower cable-stayed bridge. The approach bridge type is a 30 meter/span simply supported plate girder bridge, with a bridge length of 965.02m (of which the main bridge is 434.5m long and the approach bridge is 530.52m long), a width of 30m, two-way 6-lane, a design speed of 60km/h, a design load of vehicles - Super 20, trailers -120, and a crowd of 3.5kn/m2. The main bridge has been officially started on December 26, 2000, There are two contract sections of civil engineering main bridge, South Approach Bridge (c) and North approach bridge (b) and one contract section of construction supervision for this project and even the larger loss project caused by the damage of brand reputation. This bidding is the contract section of civil engineering south approach bridge (c) and North approach bridge (b)

3. The tenderee will follow the principles of openness, fairness, impartiality and integrity, and prequalify the bidders participating in the project in the form of domestic public bidding

4. Bidders participating in civil engineering bidding must have first-class highway engineering construction qualification and corresponding credit registration, and have corresponding construction teams with similar bridge engineering approach construction performance

5. Bidders can purchase prequalification documents from the tenderee at the address stated in this announcement. The prequalification documents will be sold from 8:30 a.m. to 5:30 p.m. every day from August 1, 2001 to August 3, 2001, and work as usual on holidays

6. Interested bidders shall purchase prequalification documents by presenting the letter of introduction, ID card, business license, qualification grade certificate, credit registration, original credit certificate (the copy submitted to the tenderee shall be stamped with official seal), and each set of Prequalification documents is 1000 yuan, which will not be refunded after sales

7. The pre qualification document of the bid was delivered to Yibin development economic and Technological Development Corporation in person before 5:30 p.m. on August 10, 2001. The tenderee refuses to accept the delayed prequalification documents

8. The tenderee will timely notify the bidding applicant of the preliminary review results, and only the bidders who pass the preliminary review can participate in the bidding

address: No. 59, middle section of Jiudu Road, Nan'an, Yibin, Sichuan Province zip code: 644002

Bayer materials technology has 30 production bases and about 14300 employees in the world

Tel: (0831)

Fax: (0831)

Contact: Xiao Wenjie, Gao Xiang

Sichuan Yibin expansion economic and Technological Development Corporation

legal representative: Luo Wenzheng

July 25, 2001